The working process of transformer brands is a more complex process, and at the moment of turning on the power, it is a more complex process that requires a lot of knowledge. Transformers play an important role in people's production and life, bringing convenience to people. We also want to understand them, otherwise accidents cannot be solved on their own. Since the operation of transformers is based on power supply, that is to say, the operation of transformers starts from power supply, how to determine the safety performance of power supply?
There are the following precautions for the safety of transformer power transmission:
A. In addition to factory testing by the manufacturer, new transformers should undergo on-site core inspection before installation and operation; The same applies after major repairs. (Short distance transportation without bumps cannot be carried out, but a pressure test should be conducted)
B、 When the transformer is shut down for more than six months, the insulation resistance should be measured and an oil pressure resistance test should be conducted.
C、 The transformer should undergo ≤ 5 full voltage closing impulse tests for the first operation, and ≤ 3 tests after maintenance. After 24 hours of no-load operation without any abnormalities, the load should be gradually put into operation; And keep good records. The purpose is to check whether the insulation strength of the transformer can withstand the rated voltage or the occurrence during operation.
Operating overvoltage is also to evaluate the mechanical strength of transformers and the reliability of relay protection actions.
D、 The insulation resistance of newly installed and overhauled transformers should not be lower than 70% of the manufacturer's test value at the same temperature.
E、 To improve the utilization rate of transformers and reduce transformer losses, it is more reasonable for the load current of transformers to be 75-85% of the rated current.
The safety performance of transformers is relatively good, and it is also the beginning of operation. Ensure the safety of the transformer, pay attention to relevant systems, and ensure the normal operation of the transformer!

Service Hotline
150-2433-5601
Landline: 400 000 1127 , 0573-82721507
Mobile:+86-153-9728-8213 (Manager Zhao)
+86-150-2433-5601 (Manager Zhang)
Fax:+86-573-8272-6135
Email: jsemarketing1@126.com
Meiziqing88@163.com
Address: Building 35, Jiaxin Silk Industrial Park, No. 2710 Zhongshan West Road, Jiaxing City, Zhejiang Province
Official WeChat
Official Website